New Construction

New Construction Wiring in Woodinville

One electrical contractor from the first drawing to the final inspection, working to your builder's timetable.

Talk about my build — (000) 000-0000
Wooden wall framing against a clear blue sky

Build It Right the First Time

A new build is your one chance to put every circuit where it belongs without opening a wall later. It is also the cheapest moment to decide on amperage, garage charging and how the lighting will be controlled.

Our new-build clients range from families building their own place to builders putting up ADUs and big additions. A load calculation sets the service size, we agree the layout space by space, and equipment you expect down the road, such as a garage charger, has its wiring path roughed in today.

We keep to the build schedule, book inspections ahead and hand over clean paperwork at the end: load calculation, layout and a typed panel directory for the house file. If plans change mid-build, as they often do, we price the change in writing before doing it, so the electrical budget never drifts quietly.

Owner-builder without a general contractor? We will help you sequence the electrical inspections around framing, insulation and drywall so nobody is waiting on anyone.

The Full Package

Plans to final, nothing left hanging.

Calculated service

Panel and service sized for the design with sensible headroom.

Agreed layout

Receptacles, switches, lighting and appliance circuits confirmed before rough-in.

Temporary power

Construction power set up early so other trades can start on time.

Rough-in

Boxes, cable and low-voltage paths installed neatly once framing is done.

Future-ready circuits

Lines or conduit placed now for chargers and heat pumps coming later.

Lighting and switching

Fixtures and controls placed around how each room will be used.

Inspections

Rough-in and final booked in advance so the schedule holds.

Finish and paperwork

Devices set, circuits tested, directory and records handed over.

How We Fit the Build

  1. Plan review

    We go through the drawings, run the load calculation and issue an itemised scope the contractor can schedule against.

  2. Rough-in

    When framing is ready we rough in the house over a few days and call for inspection before insulation.

  3. Finish

    After paint we set devices and fixtures, energize and test every circuit and pass the final.

Why Builders Use Us

On site when framing is

Rough-in follows the build schedule rather than ours, so the insulation crew is never kept waiting.

Questions asked early

Chargers and heat pumps planned before the walls close.

Clean records

Everything the owner needs later, from the load calculation to the panel directory, handed over in writing.

  • Calculated serviceFor the design.
  • Inspections bookedIn advance.
  • On the GC's clockNot ours.
  • Full recordsAt handover.